- An Urness water heater was re-calibrated Monday morning. A new temperature controller has been ordered and received. If this issue happens again, we have the part on hand to replace it. Replacing the temperature controller will require a water shut down that would be scheduled with Residence Life.
- No hot water in the Hagfors Center was discovered at 5 p.m. Wednesday. Workers discovered a failed mixing valve. Hot water was restored by 1 p.m. Thursday. Facilities ordered a rebuild kit for the mixing valve and that work will happen next week.
As previously noted:
- Two lights in front of Sverdrup will be removed in spring and an LED light will be mounted above the entrance after the ground thaws.
- The final phase of mechanical HVAC work at Christensen Center continues.