Skip to content
- Two lights in front of Sverdrup will be removed in spring and an LED light will be mounted above the entrance after the ground thaws.
- The final phase of mechanical HVAC work at Christensen Center continues.
- A makeup air unit with a leak is being repaired in Mortensen Hall. Some have noticed humidity in the lobby and the repair will correct that.
- A heating system component at Old Main failed Wednesday morning and classrooms weren’t heated. The part was replaced that morning.
- Water was shut down for a short time Wednesday in Memorial Hall so that a water pipe break could be repaired.