{"id":904,"date":"2024-08-21T02:16:32","date_gmt":"2024-08-21T02:16:32","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=904"},"modified":"2024-08-21T02:20:27","modified_gmt":"2024-08-21T02:20:27","slug":"work-finishing-up-on-murphy-square","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2024\/08\/21\/work-finishing-up-on-murphy-square\/","title":{"rendered":"Work Finishing Up on Murphy Square"},"content":{"rendered":"<p>Work on the updates to Murphy Square park is expected to finish up this week, creating new east-to-west walkways lined with lights and benches across the park.<\/p>\n<p>The work also included grouping tables and grills as well as grading and reseeding areas affected by the work.<\/p>\n<p>This week, crews are scheduled to remove the perimeter fencing, opening the park&#8217;s pathways up for use. In some spaces within the park, fencing will remain in order to protect newly seeded ground. In other areas, seeded spaces will not have fencing. Park users are encouraged to avoid walking on the newly seeded areas this fall (see photos, below) to help new grass take root for next spring.<\/p>\n<figure id=\"attachment_906\" aria-describedby=\"caption-attachment-906\" style=\"width: 465px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-906\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-protective-fencing.jpg\" alt=\"New path through Murphy Square with fencing on either side to protect newly seeded ground\" width=\"465\" height=\"309\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-protective-fencing.jpg 779w, https:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-protective-fencing-300x199.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-protective-fencing-768x511.jpg 768w\" sizes=\"auto, (max-width: 465px) 85vw, 465px\" \/><figcaption id=\"caption-attachment-906\" class=\"wp-caption-text\">Some areas of Murphy Square may continue to have fencing to protect newly seeded ground.<\/figcaption><\/figure>\n<figure id=\"attachment_905\" aria-describedby=\"caption-attachment-905\" style=\"width: 463px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-905\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-open.jpg\" alt=\"New path through Murphy Square with light-colored, seeded areas along each side\" width=\"463\" height=\"344\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-open.jpg 740w, https:\/\/sites.augsburg.edu\/facilities\/files\/2024\/08\/Murphy-Square-open-300x223.jpg 300w\" sizes=\"auto, (max-width: 463px) 85vw, 463px\" \/><figcaption id=\"caption-attachment-905\" class=\"wp-caption-text\">Areas affected by the renovation work in Murphy Square have been reseeded. (See the lighter areas along the path in this photo.) Park users should avoid walking on the newly seeded areas this fall.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Work on the updates to Murphy Square park is expected to finish up this week, creating new east-to-west walkways lined with lights and benches across the park. The work also included grouping tables and grills as well as grading and reseeding areas affected by the work. This week, crews are scheduled to remove the perimeter &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2024\/08\/21\/work-finishing-up-on-murphy-square\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Work Finishing Up on Murphy Square&#8221;<\/span><\/a><\/p>\n","protected":false},"author":48,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-904","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/48"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=904"}],"version-history":[{"count":3,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/904\/revisions"}],"predecessor-version":[{"id":909,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/904\/revisions\/909"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=904"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=904"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}