{"id":662,"date":"2021-11-08T13:58:59","date_gmt":"2021-11-08T13:58:59","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=662"},"modified":"2021-11-08T13:58:59","modified_gmt":"2021-11-08T13:58:59","slug":"work-in-lot-l-continues","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/11\/08\/work-in-lot-l-continues\/","title":{"rendered":"Work in Lot L Continues"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">More concrete work in Lot L will take place the week of November 8. It is scheduled to be complete by the end of the week.<\/span><\/p>\n<p><strong>Athletic Dome Is Going Up at the End of the Month<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">The Athletic Dome is scheduled to go up on Monday and Tuesday, November 29 and 30.\u00a0<\/span><\/p>\n<p><strong>LED Conversion Will Resume on November 29\u00a0<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">The replacement of all campus light bulbs with LED light bulbs is scheduled to resume on November 29. Facilities is building a schedule and will contact departments about when they can expect upgrades to occur.<\/span><\/p>\n<p><strong>Science 123 Classroom Remodeling Progress<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">The railing is scheduled to be installed by December 1, the last step in the project.<\/span><\/p>\n<p><strong>Air Filtration<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">We continue to operate HEPA filters in classrooms, common spaces, and in offices in buildings with central HVAC systems. In buildings with central HVAC, we continue to use MERV-13 filters circulating fresh air 24 hours a day.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>More concrete work in Lot L will take place the week of November 8. It is scheduled to be complete by the end of the week. Athletic Dome Is Going Up at the End of the Month The Athletic Dome is scheduled to go up on Monday and Tuesday, November 29 and 30.\u00a0 LED Conversion &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/11\/08\/work-in-lot-l-continues\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Work in Lot L Continues&#8221;<\/span><\/a><\/p>\n","protected":false},"author":161,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-662","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/161"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=662"}],"version-history":[{"count":1,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/662\/revisions"}],"predecessor-version":[{"id":663,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/662\/revisions\/663"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}