{"id":645,"date":"2021-09-27T14:39:46","date_gmt":"2021-09-27T14:39:46","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=645"},"modified":"2022-04-28T19:24:33","modified_gmt":"2022-04-28T19:24:33","slug":"science-123-classroom-remodeling-2","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/09\/27\/science-123-classroom-remodeling-2\/","title":{"rendered":"Science 123 Classroom Remodeling"},"content":{"rendered":"<p><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-646 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-225x300.jpg 225w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-768x1024.jpg 768w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-1152x1536.jpg 1152w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-1536x2048.jpg 1536w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-1200x1600.jpg 1200w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/09\/Science-123-Remodeling-Tiered-Platforms-rotated.jpg 1773w\" sizes=\"auto, (max-width: 225px) 85vw, 225px\" \/>Work has begun on the tiered platforms and is going well. That phase of the project should be completed by Wednesday, September 29. The next phase will be carpet installation; once that is scheduled, we should be able to announce when the classroom will be available for use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Date Set for New Dome Installation<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Weather permitting, the new dome over the athletic field will be installed on Saturday, November 20.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Return to Campus Updates:\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What to know about <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">cleaning office spaces<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Buildings with HVAC systems were upgraded with MERV-13 filters circulating fresh air 24 hours a day. In buildings without central HVAC systems, HEPA filtration units have been added in office spaces. There are also HEPA filtration units in classrooms.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic but the southbound side will remain closed at least until mid-October. It will require a more significant repair. <b>In addition, <\/b>I-94 west is closed between Highway 280\u00a0 and 25th Avenue from 10 p.m. to 5 a.m. nightly Wednesday, September 15, to Wednesday, October 6, for repairs to 25th Avenue bridge. This includes weekends. MnDOT apologizes for the inconvenience.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Work has begun on the tiered platforms and is going well. That phase of the project should be completed by Wednesday, September 29. The next phase will be carpet installation; once that is scheduled, we should be able to announce when the classroom will be available for use. Date Set for New Dome Installation Weather &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/09\/27\/science-123-classroom-remodeling-2\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Science 123 Classroom Remodeling&#8221;<\/span><\/a><\/p>\n","protected":false},"author":161,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-645","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/161"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=645"}],"version-history":[{"count":3,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/645\/revisions"}],"predecessor-version":[{"id":742,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/645\/revisions\/742"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}