{"id":639,"date":"2021-09-16T15:26:33","date_gmt":"2021-09-16T15:26:33","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=639"},"modified":"2021-09-16T15:55:19","modified_gmt":"2021-09-16T15:55:19","slug":"science-123-classroom-remodeling-in-progress","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/09\/16\/science-123-classroom-remodeling-in-progress\/","title":{"rendered":"Science 123 Classroom Remodeling In Progress"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The Science 123 renovation project, which will include the addition of tiered platforms to expand capacity, began last week with demolition of the fixed seating and removal of the old carpet. New construction will begin this week. The new chairs for the classroom have already been delivered.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Steam Trap Leak Fixed Before Service Disruption<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Many of us never know about well-managed emergencies. On Thursday, September 9, maintenance staff noticed a leak involved in a high-pressure steam trap on Augsburg\u2019s main distribution line. Facilities staff worked with MMC and Clearway Energy to fix the problem, and were able to repair the leak with no interruptions to service.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Return to Campus Updates:\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What to know about <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">cleaning office spaces<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Buildings with HVAC systems were upgraded with MERV-13 filters are circulating fresh air 24 hours a day. In buildings without central HVAC systems, HEPA filtration units have been added in office spaces. There are also HEPA filtration units in classrooms.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Staff and faculty in Memorial Hall who want to <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\"><span style=\"font-weight: 400;\">request a window air conditioner<\/span><\/a><span style=\"font-weight: 400;\"> should make a Facilities request. Facilities will provide and install the unit, since the building doesn\u2019t have central air conditioning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic but the southbound side will remain closed at least until mid-October. It will require a more significant repair. MnDOT apologizes for the inconvenience.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Science 123 renovation project, which will include the addition of tiered platforms to expand capacity, began last week with demolition of the fixed seating and removal of the old carpet. New construction will begin this week. The new chairs for the classroom have already been delivered. Steam Trap Leak Fixed Before Service Disruption Many &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/09\/16\/science-123-classroom-remodeling-in-progress\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Science 123 Classroom Remodeling In Progress&#8221;<\/span><\/a><\/p>\n","protected":false},"author":143,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-639","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/143"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=639"}],"version-history":[{"count":2,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/639\/revisions"}],"predecessor-version":[{"id":641,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/639\/revisions\/641"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}