{"id":631,"date":"2021-08-27T09:00:59","date_gmt":"2021-08-27T09:00:59","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=631"},"modified":"2022-04-28T19:24:19","modified_gmt":"2022-04-28T19:24:19","slug":"energy-saving-led-lights-being-installed-campuswide","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/08\/27\/energy-saving-led-lights-being-installed-campuswide\/","title":{"rendered":"Energy-Saving LED Lights Being Installed Campuswide"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">All campus light bulbs are being replaced with energy-saving LED lights by<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-565 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2021\/03\/Dome-and-skyline-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/03\/Dome-and-skyline-300x200.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/03\/Dome-and-skyline-768x512.jpg 768w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/03\/Dome-and-skyline-1024x683.jpg 1024w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/03\/Dome-and-skyline.jpg 1200w\" sizes=\"auto, (max-width: 300px) 85vw, 300px\" \/> the end of the year. Facilities will notify departments about a week ahead of time and share updates via A-mail. The cost savings was planned to pay for a needed replacement for the Edor Nelson Athletic Field dome. The new dome will be installed the first week in November.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Campus Meeting Space<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">There\u2019s a lot of demand for student organizations to meet, so Anderson 21 and Sverdrup 208 are being turned into meeting spaces. Anderson 21, in the residence hall\u2019s basement, was used by McGough Construction as an office during the Hagfors Center construction and will be updated with paint, new carpet, and technology to become a meeting room. Sverdrup 208, the former Honors Lounge, also is being turned into a meeting space and painting has begun. Once the projects are complete, it will be communicated via A-mail and reservations can be made.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Return to Campus Updates:\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Sanitization stands with hand sanitizer and disinfecting wipes are stationed at the front entrance of every building on the Minneapolis campus.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What to know about <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">cleaning office spaces<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Consider returning to your office, lab, or classroom in advance of your scheduled return to review the spaces. We need your assistance in spotting and addressing repairs and maintenance that may be needed. Make a <a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\">Facilities request<\/a> if you see an issue that needs to be addressed.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">HEPA air filtration units have been added to offices without HVAC building systems only. HVAC systems with MERV-13 filters are circulating fresh air 24 hours a day.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Staff and faculty in Memorial Hall who want to request a window air conditioner should make a Facilities request. Facilities will provide and install the unit, since the building doesn\u2019t have central air conditioning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic this week but the southbound side will remain closed at least until mid-October. It will require a more significant repair. MnDOT apologizes for the inconvenience.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>All campus light bulbs are being replaced with energy-saving LED lights by the end of the year. Facilities will notify departments about a week ahead of time and share updates via A-mail. The cost savings was planned to pay for a needed replacement for the Edor Nelson Athletic Field dome. The new dome will be &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/08\/27\/energy-saving-led-lights-being-installed-campuswide\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Energy-Saving LED Lights Being Installed Campuswide&#8221;<\/span><\/a><\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-631","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=631"}],"version-history":[{"count":2,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/631\/revisions"}],"predecessor-version":[{"id":741,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/631\/revisions\/741"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}