{"id":624,"date":"2021-08-06T09:00:49","date_gmt":"2021-08-06T09:00:49","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=624"},"modified":"2022-04-28T19:23:37","modified_gmt":"2022-04-28T19:23:37","slug":"southbound-25th-avenue-bridge-closed-classrooms-remodeled-return-to-campus-updates","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/08\/06\/southbound-25th-avenue-bridge-closed-classrooms-remodeled-return-to-campus-updates\/","title":{"rendered":"Southbound 25th Avenue Bridge Closed, Classrooms\u2019 Remodeled, Return to Campus Updates"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-536 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/HagforsBold-300x200.jpg\" alt=\"\" width=\"230\" height=\"153\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/HagforsBold-300x200.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/HagforsBold-768x512.jpg 768w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/HagforsBold-1024x683.jpg 1024w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/HagforsBold.jpg 1200w\" sizes=\"auto, (max-width: 230px) 85vw, 230px\" \/>MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic this week but the southbound side will remain closed at least until mid-October. It will require a more significant repair. MnDOT apologizes for the inconvenience.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Classrooms Remodeled By Fall<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Science 123 is being remodeled with the addition of three tiered platforms to expand capacity, new carpet, and technology. The goal is for the work to be complete by September 1.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Anderson 21 also will be updated with paint, new carpet, and technology. Walls will be removed and the construction of the sound wall started on August 2.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Sverdrup 208, the former Honors Lounge, is getting new technology and paint. The furniture has been removed and painting started August 2.\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Return to Campus Updates:\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What to know about <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">cleaning office spaces<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Consider returning to your office, lab, or classroom in advance of your scheduled return to review the spaces. We need your assistance in spotting and addressing repairs and maintenance that may be needed. Make a <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\"><span style=\"font-weight: 400;\">Facilities request<\/span><\/a><span style=\"font-weight: 400;\"> if you see an issue that needs to be addressed.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">HEPA air filtration units have been added to offices without HVAC building systems only. HVAC systems with MERV-13 filters are circulating fresh air 24 hours a day.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Staff and faculty in Memorial Hall who want to <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\"><span style=\"font-weight: 400;\">request a window air conditioner<\/span><\/a><span style=\"font-weight: 400;\"> should make a Facilities request. Facilities will provide and install the unit, since the building doesn\u2019t have central air conditioning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Facilities team members are working this summer on cleaning and maintenance projects as rooms turn over in the residence halls.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic this week but the southbound side will remain closed at least until mid-October. It will require a more significant repair. MnDOT apologizes for the inconvenience. Classrooms Remodeled By &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/08\/06\/southbound-25th-avenue-bridge-closed-classrooms-remodeled-return-to-campus-updates\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Southbound 25th Avenue Bridge Closed, Classrooms\u2019 Remodeled, Return to Campus Updates&#8221;<\/span><\/a><\/p>\n","protected":false},"author":143,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-624","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/143"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=624"}],"version-history":[{"count":4,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/624\/revisions"}],"predecessor-version":[{"id":739,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/624\/revisions\/739"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}