{"id":616,"date":"2021-07-06T17:19:01","date_gmt":"2021-07-06T17:19:01","guid":{"rendered":"https:\/\/sites.augsburg.edu\/facilities\/?p=616"},"modified":"2022-04-28T19:23:10","modified_gmt":"2022-04-28T19:23:10","slug":"classrooms-remodeled-by-fall","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/07\/06\/classrooms-remodeled-by-fall\/","title":{"rendered":"Classrooms Remodeled by Fall"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-542 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/Quad2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/Quad2-300x200.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2021\/01\/Quad2.jpg 600w\" sizes=\"auto, (max-width: 300px) 85vw, 300px\" \/>Science 123 has been approved for remodeling with the addition of three tiered platforms to expand capacity, new carpet, and technology.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Anderson 21 also will be updated with paint, new carpet, and technology.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Sverdrup 208 is getting new technology and paint.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The goal is for the classroom upgrades to be complete by Aug. 15.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Other updates:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Facilities team members are working this summer on cleaning and maintenance projects as rooms turn over in the residence halls.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Consider returning to your office, lab, or classroom in advance of your scheduled return to review the spaces. We need your assistance in spotting and addressing repairs and maintenance that may be needed. Make a <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\"><span style=\"font-weight: 400;\">Facilities request<\/span><\/a><span style=\"font-weight: 400;\"> if you see an issue that needs to be addressed.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What to know about <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">cleaning office spaces<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Staff and faculty in Memorial Hall who want to <\/span><a href=\"https:\/\/inside.augsburg.edu\/facilitiesrequest\/\"><span style=\"font-weight: 400;\">request a window air conditioner<\/span><\/a><span style=\"font-weight: 400;\"> should make a Facilities request. Facilities will provide and install the unit, since the building doesn\u2019t have central air conditioning.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Science 123 has been approved for remodeling with the addition of three tiered platforms to expand capacity, new carpet, and technology.\u00a0 Anderson 21 also will be updated with paint, new carpet, and technology. Sverdrup 208 is getting new technology and paint. The goal is for the classroom upgrades to be complete by Aug. 15. Other &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/07\/06\/classrooms-remodeled-by-fall\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Classrooms Remodeled by Fall&#8221;<\/span><\/a><\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-616","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=616"}],"version-history":[{"count":3,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/616\/revisions"}],"predecessor-version":[{"id":737,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/616\/revisions\/737"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}