{"id":592,"date":"2021-05-07T08:00:32","date_gmt":"2021-05-07T08:00:32","guid":{"rendered":"http:\/\/sites.augsburg.edu\/facilities\/?p=592"},"modified":"2021-05-06T19:35:56","modified_gmt":"2021-05-06T19:35:56","slug":"no-parking-may-11-in-lot-h-for-t-mobile-oren-gateway-project-student-environmental-committee-funding-some-projects","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2021\/05\/07\/no-parking-may-11-in-lot-h-for-t-mobile-oren-gateway-project-student-environmental-committee-funding-some-projects\/","title":{"rendered":"No Parking May 11 in Lot H for T-Mobile Oren Gateway Project; Student Environmental Committee Funding Some Projects"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><a href=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2019\/11\/78220970_2746567662061855_7515862076993044480_n.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-216 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2019\/11\/78220970_2746567662061855_7515862076993044480_n-300x223.jpg\" alt=\"Trees\" width=\"300\" height=\"223\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2019\/11\/78220970_2746567662061855_7515862076993044480_n-300x223.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2019\/11\/78220970_2746567662061855_7515862076993044480_n.jpg 750w\" sizes=\"auto, (max-width: 300px) 85vw, 300px\" \/><\/a>T-Mobile is scheduled on May 11 to do antenna updates on the roof of Oren Gateway. Parking Lot H will be closed that day. A sign will be posted about the closure. Those who park in Lot H should park in any other surface lot. Any vehicles left in Lot H will be relocated to Lot L at the owner\u2019s expense on that day. Contact <\/span><a href=\"https:\/\/www.augsburg.edu\/dps\/\"><span style=\"font-weight: 400;\">Public Safety<\/span><\/a><span style=\"font-weight: 400;\">, 612-330-1717, with any questions related to the lot closure.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Augsburg\u2019s Day Student Government Environmental Action Committee is providing $25,000 to fund three Facilities projects. Work is starting to create a permeable path under the skyway between Lindell Library and Oren Gateway Center. The funds also will be used to install water bottle filling stations on the third through ninth floors of Urness Residence Hall. Funds also will be used for the LED lights that are a part of the remodeling of the Old Main second-floor classrooms. That project also includes new ceiling tiles, LED lights, HVAC diffusers, and carpeting and is tentatively scheduled for completion by May 31.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Students in the Graphic Systems class are completing painting a mural in the Old Main tunnels to welcome faculty and staff back to campus. The students brought the project to the Campus Design Committee of the University Council, and they approved the project because of the moment we\u2019re in and that this particular class has the opportunity to do something special to welcome folks back as they return. <\/span><a href=\"https:\/\/www.instagram.com\/muraltakeover\/\"><span style=\"font-weight: 400;\">See the mural in progress<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/04\/09\/returning-to-campus-what-to-know-about-cleaning-office-spaces\/\"><span style=\"font-weight: 400;\">Find out<\/span><\/a><span style=\"font-weight: 400;\"> about cleaning office spaces as you return to campus.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>T-Mobile is scheduled on May 11 to do antenna updates on the roof of Oren Gateway. Parking Lot H will be closed that day. A sign will be posted about the closure. Those who park in Lot H should park in any other surface lot. Any vehicles left in Lot H will be relocated to &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2021\/05\/07\/no-parking-may-11-in-lot-h-for-t-mobile-oren-gateway-project-student-environmental-committee-funding-some-projects\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;No Parking May 11 in Lot H for T-Mobile Oren Gateway Project; Student Environmental Committee Funding Some Projects&#8221;<\/span><\/a><\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-592","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=592"}],"version-history":[{"count":4,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/592\/revisions"}],"predecessor-version":[{"id":597,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/592\/revisions\/597"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}