{"id":407,"date":"2020-06-12T16:37:08","date_gmt":"2020-06-12T16:37:08","guid":{"rendered":"http:\/\/sites.augsburg.edu\/facilities\/?p=407"},"modified":"2020-06-25T16:50:10","modified_gmt":"2020-06-25T16:50:10","slug":"student-workers-painting-residence-hall-units-ice-arena-reopening-for-rentals","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2020\/06\/12\/student-workers-painting-residence-hall-units-ice-arena-reopening-for-rentals\/","title":{"rendered":"Student Workers Painting Residence Hall Units; Ice Arena Reopening for Rentals\u00a0"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\"><a href=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051.jpeg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-410 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051-300x225.jpeg\" alt=\"Ice arena\" width=\"257\" height=\"193\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051-300x225.jpeg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051-768x576.jpeg 768w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051-1024x768.jpeg 1024w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051-1200x900.jpeg 1200w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/06\/55051.jpeg 1280w\" sizes=\"auto, (max-width: 257px) 85vw, 257px\" \/><\/a><span style=\"font-weight: 400;\">Augsburg has hired student workers to paint rooms inside residence halls rather than outside contractors. They are currently working on Urness hall and will be painting in all of them this summer.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The Augsburg Ice Arena is reopening June 15 for rental only. The arena shut down in March because of a roof leak that\u2019s been repaired.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Augsburg is working under a modified operations plan, which is in effect until further notice during the COVID-19 pandemic. Summer classes are online. Employees (including faculty, staff, and student workers) whose roles are deemed critical to university operations will retain access to campus buildings for work purposes. Resident students who received exceptions to live on campus still retain fob access to their residence hall.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Cloth masks are in stock for critical staff and faculty and resident students. Contact <\/span><a href=\"mailto:massich@augsburg.edu\"><span style=\"font-weight: 400;\">Bryan Massich<\/span><\/a><span style=\"font-weight: 400;\"> to receive one. <\/span><span style=\"font-weight: 400;\">All staff, faculty and students MUST wear cloth face masks while in any common areas while on Augsburg property, based on Minnesota Department of Health guidelines for higher education. Resident students must wear them while out of their residence hall living spaces. <\/span><b>Wearing cloth masks does not replace the need to adhere to frequent hand washing, avoiding touching the face, and practicing social distancing<\/b><span style=\"font-weight: 400;\">, our best tools to help prevent the spread of illness.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Critical employees who are entering a space that\u2019s been marked cleaned and disinfected, please take the sign down and put in a work order to have it cleaned and disinfected. If you plan to work multiple days in a row, please wait until your last visit <\/span><a href=\"https:\/\/sites.augsburg.edu\/facilities\/notices\/\"><span style=\"font-weight: 400;\">to make a work order<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Augsburg has hired student workers to paint rooms inside residence halls rather than outside contractors. They are currently working on Urness hall and will be painting in all of them this summer. The Augsburg Ice Arena is reopening June 15 for rental only. The arena shut down in March because of a roof leak that\u2019s &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2020\/06\/12\/student-workers-painting-residence-hall-units-ice-arena-reopening-for-rentals\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Student Workers Painting Residence Hall Units; Ice Arena Reopening for Rentals\u00a0&#8220;<\/span><\/a><\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-407","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=407"}],"version-history":[{"count":4,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/407\/revisions"}],"predecessor-version":[{"id":420,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/407\/revisions\/420"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}