{"id":330,"date":"2020-03-06T20:15:57","date_gmt":"2020-03-06T20:15:57","guid":{"rendered":"http:\/\/sites.augsburg.edu\/facilities\/?p=330"},"modified":"2020-03-12T16:27:20","modified_gmt":"2020-03-12T16:27:20","slug":"work-in-si-melby-and-memorial-hall","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2020\/03\/06\/work-in-si-melby-and-memorial-hall\/","title":{"rendered":"Work in Si Melby and Memorial Hall"},"content":{"rendered":"<ul>\n<li><a href=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/03\/si_melby_exterior_3-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-341 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/03\/si_melby_exterior_3-1-300x221.jpg\" alt=\"Si Melby Hall\" width=\"289\" height=\"213\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/03\/si_melby_exterior_3-1-300x221.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/03\/si_melby_exterior_3-1.jpg 610w\" sizes=\"auto, (max-width: 289px) 85vw, 289px\" \/><\/a>A roof leak in Si Melby caused an ice arena equipment outage. The rinks are offline for the rest of March as a result so repairs can be made. A crew has been working to clear the ice and water down to the cement base. The rink ice will be replaced after the control equipment is repaired.<\/li>\n<li>A first-floor men&#8217;s restroom toilet overflowed clean water leading to flooding Thursday afternoon in Memorial Hall. A cleaning crew was on site Friday to clean floors, wipe walls down and disinfect to make sure the areas impacted are cleaned thoroughly.<\/li>\n<\/ul>\n<p>As previously noted:<\/p>\n<ul>\n<li>The final phase of mechanical HVAC work at Christensen Center continues.<\/li>\n<li>Two lights in front of Sverdrup will be removed in spring and an LED light will be mounted above the entrance after the ground thaws.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A roof leak in Si Melby caused an ice arena equipment outage. The rinks are offline for the rest of March as a result so repairs can be made. A crew has been working to clear the ice and water down to the cement base. The rink ice will be replaced after the control equipment &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2020\/03\/06\/work-in-si-melby-and-memorial-hall\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Work in Si Melby and Memorial Hall&#8221;<\/span><\/a><\/p>\n","protected":false},"author":124,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-330","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/124"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=330"}],"version-history":[{"count":8,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/330\/revisions"}],"predecessor-version":[{"id":342,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/330\/revisions\/342"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}