{"id":327,"date":"2020-02-28T21:07:25","date_gmt":"2020-02-28T21:07:25","guid":{"rendered":"http:\/\/sites.augsburg.edu\/facilities\/?p=327"},"modified":"2020-03-12T16:30:16","modified_gmt":"2020-03-12T16:30:16","slug":"work-at-oren-gateway-center-to-include-sheetrock-paint-and-carpet","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2020\/02\/28\/work-at-oren-gateway-center-to-include-sheetrock-paint-and-carpet\/","title":{"rendered":"Work at Oren Gateway Center to Include Sheetrock, Paint, and Carpet"},"content":{"rendered":"<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><a href=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/02\/17-0831_01-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-343 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/02\/17-0831_01-1-300x200.jpg\" alt=\"OGC\" width=\"246\" height=\"164\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/02\/17-0831_01-1-300x200.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/02\/17-0831_01-1.jpg 600w\" sizes=\"auto, (max-width: 246px) 85vw, 246px\" \/><\/a>Sheetrock, paint, and carpet are being installed and that work will continue into next week in Oren Gateway Center 114 and the offices in 115. On February 19, a clogged kitchen sink overflowed into a residence hall apartment on the second floor and leaked to the first floor. Repairs to the apartment also are underway.\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">As previously noted:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The final phase of mechanical HVAC work at Christensen Center continues.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Two lights in front of Sverdrup will be removed in spring and an LED light will be mounted above the entrance after the ground thaws.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Sheetrock, paint, and carpet are being installed and that work will continue into next week in Oren Gateway Center 114 and the offices in 115. On February 19, a clogged kitchen sink overflowed into a residence hall apartment on the second floor and leaked to the first floor. Repairs to the apartment also are underway.\u00a0 &hellip; <a href=\"https:\/\/sites.augsburg.edu\/facilities\/2020\/02\/28\/work-at-oren-gateway-center-to-include-sheetrock-paint-and-carpet\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Work at Oren Gateway Center to Include Sheetrock, Paint, and Carpet&#8221;<\/span><\/a><\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,1],"tags":[],"class_list":["post-327","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=327"}],"version-history":[{"count":2,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/327\/revisions"}],"predecessor-version":[{"id":344,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/327\/revisions\/344"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}