{"id":259,"date":"2020-01-24T08:00:05","date_gmt":"2020-01-24T08:00:05","guid":{"rendered":"http:\/\/sites.augsburg.edu\/facilities\/?p=259"},"modified":"2020-01-30T04:28:05","modified_gmt":"2020-01-30T04:28:05","slug":"final-phase-of-heating-system-work-at-christensen-urness-sprinkler-system-repair","status":"publish","type":"post","link":"https:\/\/sites.augsburg.edu\/facilities\/2020\/01\/24\/final-phase-of-heating-system-work-at-christensen-urness-sprinkler-system-repair\/","title":{"rendered":"Final Phase of Heating System Work at Christensen, Urness Sprinkler System Repair"},"content":{"rendered":"<p><a href=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/01\/18-0628_17-1-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-269 alignright\" src=\"http:\/\/sites.augsburg.edu\/facilities\/files\/2020\/01\/18-0628_17-1-1-300x225.jpg\" alt=\"Urness Hall\" width=\"244\" height=\"183\" srcset=\"https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/01\/18-0628_17-1-1-300x225.jpg 300w, https:\/\/sites.augsburg.edu\/facilities\/files\/2020\/01\/18-0628_17-1-1.jpg 600w\" sizes=\"auto, (max-width: 244px) 85vw, 244px\" \/><\/a><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Makeup air unit repairs continue this week as part of the final phase of mechanical HVAC work at Christensen Center. (1\/28 update)<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The fire pump in Urness has been rebuilt successfully. This is a major component of the sprinkler system. (1\/28 update)<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Makeup air unit repairs continue this week as part of the final phase of mechanical HVAC work at Christensen Center. (1\/28 update) The fire pump in Urness has been rebuilt successfully. This is a major component of the sprinkler system. (1\/28 update)<\/p>\n","protected":false},"author":136,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-259","post","type-post","status-publish","format-standard","hentry","category-maintenance-work-on-campus"],"_links":{"self":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/users\/136"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/comments?post=259"}],"version-history":[{"count":10,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/259\/revisions"}],"predecessor-version":[{"id":271,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/posts\/259\/revisions\/271"}],"wp:attachment":[{"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/media?parent=259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/categories?post=259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.augsburg.edu\/facilities\/wp-json\/wp\/v2\/tags?post=259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}